DESIGN OF THE CROSSING BY HDD OF A ROCKY HILL

Client: Appennino Energia Srl – Italy

Year: 2009-2010

What I did: I made the design of the installation by HDD, in medium to hard and high abrasive sandstone, of a pressure water HDPE pipe, DN630 mm (25 in), for a total length of 530 m (1,740 ft) along an uphill drill path, for a mini hydro-power plant.