Client: GHIZZONI Spa – Italy
Year: 2007
What I did: I made the design of 6 crossings by HDD for the installation of a DN900 gas pipeline, for a total length of 3.536 m (11.600 ft).
Client: GHIZZONI Spa – Italy
Year: 2007
What I did: I made the design of 6 crossings by HDD for the installation of a DN900 gas pipeline, for a total length of 3.536 m (11.600 ft).