SEWER MAINS AND HOUSE CONNECTIONS BY HDD

Client: SE.T.A. Srl (today ETRA Spa) – Italy

Year: 2003-2004

What I did: I made the detailed design of the installation of pressure and gravity sewer pipes by directional drilling; I carried on the training of the technical personnel (engineers, supervisors and operators). I developed a dedicated and complete HDD pit launched installation system for the connection of houses to the sewer mains. I also wrote two technical standards: the first for preliminary underground mapping and the second for the construction of house connections by using pit launched HDD machines.

SEWER MAINS AND HOUSE CONNECTIONS BY HDD

RD07-13

click on the image to see the index of the standard norm (language: Italian)


RD07-14

click on the image to see the index of the standard norm (language: Italian)


Related documents:


HDD IN CHALLENGING ROCK CONDITIONS AND COMPENSATION GROUTING BY HDD

Client: SERREMAR Srl – Italy

Year: 2006-2008

What I did: I made the detailed design of the installation of underground pipes, ranging from 100 mm (4″) to 500 mm (20″), by Horizontal Directional Drilling, in hard to very hard rock; HDD at sharp radius in rock and application of HDD to pre-tunneling compensation grouting and directional underground injections for insulation and treatment.

HDD IN CHALLENGING ROCK CONDITIONS AND COMPENSATION GROUTING BY HDD

Related documents:


INSTALLATION IN VERY HARD AND ABRASIVE ROCK OF A DN700 CAST IRON WATER PRESSURE PIPE

Client: KLAPFER BAU Srl – SANTATO MARCO TRIVELLAZIONI – Italy

Year: 2011

What I did: I made the detailed design and supervision of the installation by microtunneling and HDD, in very hard and abrasive quartzite-diorite rock, of a DN700 mm (28″) cast iron water pressure pipe – the work was split in two section, each one 80 m (265 ft) long. The borehole diameter was 800 mm (32″). A very challenging job for the extreme hardness and abrasivity of the rock. The water pressure pipe is part of a mini hydro-power plant in the Alps (Italy).

INSTALLATION IN VERY HARD AND ABRASIVE ROCK OF A DN700 CAST IRON WATER PRESSURE PIPE

 


Related documents:



 

 

PROJECT OF A DN900 GAS PIPELINE INSTALLATION BY HDD

Client: GHIZZONI Spa – Italy

Year: 2007

What I did: I made the design of 6 crossings by HDD for the installation of a DN900 gas pipeline, for a total length of 3.536 m (11.600 ft).

PROJECT OF A DN900 GAS PIPELINE INSTALLATION BY HDD

 contact-info2

 

DETAILED DESIGN OF A SEWER MAIN INSTALLATION BY HDD AND TRAINING OF THE ENGINEERING PERSONNEL

Client: TEA Spa – Italy

Year: 2011

What I did: I made the detailed design of o channel crossing, by HDD, for the installation of a pressure sewer main for a total length of 320 m (1.000 ft); this project was part of a specialized training program that I carried out with the engineering personnel of the company and that led to the completion of the project of installation of the whole sewer main, entirely made by HDD, for a total length of 5,9 km (3,7 miles), divided in 21 HDD crossings.

DETAILED DESIGN OF A SEWER MAIN INSTALLATION BY HDD AND TRAINING OF THE ENGINEERING PERSONNEL


contact-info2 

 

HDD IN DIFFICULT ALLUVIAL SOIL

Client: IMET Spa – Italy

Year: 2007

What I did: detailed design and work direction of the installation of a DN450 HDPE drainage pipe along a curved drilling path with sharp bending radius in alluvial soil with polygenic boulders, for a total length of 180 m (590 ft) – Selva di Val Gardena, Italy.

HDD IN DIFFICULT ALLUVIAL SOIL

contact-info2

DESIGN OF THE CROSSING BY HDD OF A ROCKY HILL

Client: Appennino Energia Srl – Italy

Year: 2009-2010

What I did: I made the design of the installation by HDD, in medium to hard and high abrasive sandstone, of a pressure water HDPE pipe, DN630 mm (25 in), for a total length of 530 m (1,740 ft) along an uphill drill path, for a mini hydro-power plant.

DESIGN OF THE CROSSING BY HDD OF A ROCKY HILL

contact-info2

 

 

HDD RIVER CROSSING WITH SHARP BENDING RADIUS IN VERY DIFFICULT SOIL CONDITIONS

Client: EDIL IDRAULICA Sas – Italy

Year: 2011

What I did: I made the project management and the supervision of the installation, by HDD, of three HDPE DN 560 (22 in) pressure sewer pipes under the Foglia river, Pesaro, Italy. Three directional pilot bore, with an interaxis of just 1,5 m, along a drill path with a very sharp bending radius (70 m), were successfully drilled under the river bed, facing challenging soil conditions, with big boulders and blocks of stone in a matrix of silt and clay. Although the three pilot bores were perfectly completed, on the first alignment, after completed the first final reaming at 700 mm, the first pull-back failed due to the collapse of underground unstable big blocks of rock. Despite the prohibitive soil conditions we successfully completed the pullback of the two remaining product pipes, achieving a remarkable result in a very difficult HDD work.

HDD RIVER CROSSING WITH SHARP BENDING RADIUS IN VERY DIFFICULT SOIL CONDITIONS

 


contact-info2

LANDFILLS INSULATION BY HDD

Client: MC Scarl – Cooperativa MUCAFER Scpa – Italy

Year: 2010

What I did: I worked for the main contractor MC Scarl – Cooperativa MUCAFER Scpa, as the specialized advisor for the HDD operations in the insulation of two urban landfills, for the environmental securing of the area. In less than one year approximately 60 km (37 miles) – corresponding to more than 500 horizontal directional boreholes – were drilled through soft to hard limestone rock in order to carry out underground injections to create a bottom screen below the garbage level  (total value of the HDD installations: €14M). This was the biggest project of ever for a landfill insulation made by HDD. The specialized subcontractor for HDD and soil treatments was TREVI Spa.

LANDFILLS INSULATION BY HDD

contact-info2

 

 

R&D IN HDD AND DETAILED DESIGN OF LARGE RIVER CROSSINGS

Client: FONDAZIONI SPECIALI Spa, Italy

Year: 2011-2012

What I did: I worked as the head of R&D of the HDD division, having the following charges:

  • feasibility studies for the application of HDD and microtunneling technologies
  • R&D for the use of HDD in compensation and jet grouting.
  • R&D for a non-conventional guidance system for HDD
  • R&D for hole supporting in up-hill directional drilling
  • organization and management of the mud laboratory.
  • training of engineers, supervisors and operators.

I also made the detailed design, performing the role of problem solver during the execution of large river crossing carried out by HDD for the installation of gas pipelines:

  • PO river, Italy, DN600 (24 in) for a total length of 1.300 m (4,300 ft)
  • Enza river, Italy, DN100 (4 in) for a total length of 1.200 m (4,000 ft) 
R&D IN HDD AND DETAILED DESIGN OF LARGE RIVER CROSSINGS