HYBRID PIPE JACKING/DTH CONCENTRIC AIR POWERED HAMMER TECHNIQUE

Client: AC Srl UnipersonaleSIEMENS Spa – Italy

Year: 2011

What I did: I made the detailed design and work supervision of the installation, by hybrid  pipe jacking/down-the-hole concentric air hammer technique, of three DN300 (12”) steel casings and the installation, by slip-lining, inside the 12″ steel casings, of three HDPE DN280 (11″) pipes, for the crossing of a rocky hill – Length of each crossing: 106,0 meters. The HDPE DN280 pipes, installed inside the 12″ steel casings, were used by SIEMENS to lay hi-tension electrical cables. A MITSUBISHI ULTRA MAXBIT 12″ were used to perform the boreholes.

HYBRID PIPE JACKING/DTH CONCENTRIC AIR POWERED HAMMER TECHNIQUE

 


 

LARGE DIAMETER DYNAMIC PIPE BURSTING FOR SEWER REPLACEMENT

Client: EUROSCAVI Srl – Italy

Year: 2016

What I did: I made the detailed design of the replacement by dynamic pipe bursting of a DN600 (24″) sewer concrete pipe with a DN800 (32″) HDPE pipe; I coordinated all the geological/geotechnical preliminary survey and I also made the detailed design of the bursting-expanding head, tailored shaped to work with a Tracto Technik TAURUS rammer (24″). The expander has an outside diameter of 1000 mm. The soil was sand with coarse to very coarse gravel.

LARGE DIAMETER DYNAMIC PIPE BURSTING FOR SEWER REPLACEMENT

Related documents:


 

 

SEWER MAINS AND HOUSE CONNECTIONS BY HDD

Client: SE.T.A. Srl (today ETRA Spa) – Italy

Year: 2003-2004

What I did: I made the detailed design of the installation of pressure and gravity sewer pipes by directional drilling; I carried on the training of the technical personnel (engineers, supervisors and operators). I developed a dedicated and complete HDD pit launched installation system for the connection of houses to the sewer mains. I also wrote two technical standards: the first for preliminary underground mapping and the second for the construction of house connections by using pit launched HDD machines.

SEWER MAINS AND HOUSE CONNECTIONS BY HDD

RD07-13

click on the image to see the index of the standard norm (language: Italian)


RD07-14

click on the image to see the index of the standard norm (language: Italian)


Related documents:


HDD IN CHALLENGING ROCK CONDITIONS AND COMPENSATION GROUTING BY HDD

Client: SERREMAR Srl – Italy

Year: 2006-2008

What I did: I made the detailed design of the installation of underground pipes, ranging from 100 mm (4″) to 500 mm (20″), by Horizontal Directional Drilling, in hard to very hard rock; HDD at sharp radius in rock and application of HDD to pre-tunneling compensation grouting and directional underground injections for insulation and treatment.

HDD IN CHALLENGING ROCK CONDITIONS AND COMPENSATION GROUTING BY HDD

Related documents:


REHABILITATION OF INTERNAL PIPES IN BUILDINGS

Client: IN.TEC. Srl – Italy

Year: 2008-2010

What I did: I performed the development of proprietary technology applications; strategic marketing & technical-commercial communication.

REHABILITATION OF INTERNAL PIPES IN BUILDINGS

RD28-04

click the image above to open a technical note about IN.TEC. peculiar technologies.


Related documents:


 

 

INSTALLATION IN VERY HARD AND ABRASIVE ROCK OF A DN700 CAST IRON WATER PRESSURE PIPE

Client: KLAPFER BAU Srl – SANTATO MARCO TRIVELLAZIONI – Italy

Year: 2011

What I did: I made the detailed design and supervision of the installation by microtunneling and HDD, in very hard and abrasive quartzite-diorite rock, of a DN700 mm (28″) cast iron water pressure pipe – the work was split in two section, each one 80 m (265 ft) long. The borehole diameter was 800 mm (32″). A very challenging job for the extreme hardness and abrasivity of the rock. The water pressure pipe is part of a mini hydro-power plant in the Alps (Italy).

INSTALLATION IN VERY HARD AND ABRASIVE ROCK OF A DN700 CAST IRON WATER PRESSURE PIPE

 


Related documents:



 

 

PROJECT OF A DN900 GAS PIPELINE INSTALLATION BY HDD

Client: GHIZZONI Spa – Italy

Year: 2007

What I did: I made the design of 6 crossings by HDD for the installation of a DN900 gas pipeline, for a total length of 3.536 m (11.600 ft).

PROJECT OF A DN900 GAS PIPELINE INSTALLATION BY HDD

 contact-info2

 

DESIGN OF THE REHABILITATION OF LARGE DIAMETER SEWER MAINS BY CIPP

Client: ROTECH Srl – Italy

Year: 2010

What I did: I made the detailed design of the rehabilitation, by thermal and UV CIPP, of DN1200 and DN1000 (48 and 40 in) sewer mains for a total length of 220m, at the Petrochemical Plant of Porto Marghera, Italy; detailed design of the rehabilitation, by thermal CIPP, of DN1200 (48″) sewer mains for a total length of 1.250 m, in the cities of Scafati, Pompei e Sant’Antonio Abate, Italy.

DESIGN OF THE REHABILITATION OF LARGE DIAMETER SEWER MAINS BY CIPP

Related documents:



contact-info2 

 

UV-CIPP AT THE INTERNATIONAL AIRPORT OF ROME FIUMICINO

Client: Blueco Srl – Italy

Year: 2010

What I did: I made the detailed design and project management of the rehabilitation, by UV-CIPP, of air-conditioning pipes DN350, laid under runways, at the international airport of Fiumicino Leonardo da Vinci (Rome, Italy).

UV-CIPP AT THE INTERNATIONAL AIRPORT OF ROME FIUMICINO

Related documents:



contact-info2 

 

RADAR SYSTEMS FOR CIVIL ENGINEERING

Client: IDS Spa – Italy

Year: 1999-2000

What I did: I made the feasibility study for the application of radar systems in the Detection While Tunneling (DWT), in the mapping of reinforced concrete structures and in the massive surveying of road pavement.

I also studied the marketing strategies for the diffusion of radar system for underground utilities detection and mapping.

RADAR SYSTEMS FOR CIVIL ENGINEERING

Related documents:



contact-info2