DETAILED DESIGN OF A SEWER MAIN INSTALLATION BY HDD AND TRAINING OF THE ENGINEERING PERSONNEL

Client: TEA Spa – Italy

Year: 2011

What I did: I made the detailed design of o channel crossing, by HDD, for the installation of a pressure sewer main for a total length of 320 m (1.000 ft); this project was part of a specialized training program that I carried out with the engineering personnel of the company and that led to the completion of the project of installation of the whole sewer main, entirely made by HDD, for a total length of 5,9 km (3,7 miles), divided in 21 HDD crossings.

DETAILED DESIGN OF A SEWER MAIN INSTALLATION BY HDD AND TRAINING OF THE ENGINEERING PERSONNEL


contact-info2 

 

HDD IN DIFFICULT ALLUVIAL SOIL

Client: IMET Spa – Italy

Year: 2007

What I did: detailed design and work direction of the installation of a DN450 HDPE drainage pipe along a curved drilling path with sharp bending radius in alluvial soil with polygenic boulders, for a total length of 180 m (590 ft) – Selva di Val Gardena, Italy.

HDD IN DIFFICULT ALLUVIAL SOIL

contact-info2

CIPP TECHNOLOGY HANDBOOK

Client: S3 Soncini Spa – Italy

Year: 2004-2005

What I did: I wrote the whole know-how of the company in an internal handbook containing all the instructions concerning production procedures, calculation methods and in-situ procedures of the CIPP technology. I also organized and carried out the specialized training for engineers and operators of Soncini’s licensees.

CIPP TECHNOLOGY HANDBOOK

 

Related documents:


contact-info2

 

 

DESIGN OF THE CROSSING BY HDD OF A ROCKY HILL

Client: Appennino Energia Srl – Italy

Year: 2009-2010

What I did: I made the design of the installation by HDD, in medium to hard and high abrasive sandstone, of a pressure water HDPE pipe, DN630 mm (25 in), for a total length of 530 m (1,740 ft) along an uphill drill path, for a mini hydro-power plant.

DESIGN OF THE CROSSING BY HDD OF A ROCKY HILL

contact-info2

 

 

CEMENT MORTAR LINING TECHNOLOGY AT MILANO

Client: Risanamento Condotte Srl – Italy

Year: 2008-2010

What I did: the R&D for the improvement of the Cement Mortar Lining (CML) technology and the detailed design and manufacturing supervision of motorized lining machines.On the application side I made the detailed design of the rehabilitation, by CML, of existing DN1000 (40″) and DN 1200 (48″) steel water mains, for a total length of 3.000 m (9.800 ft), in the City of Milano, Italy. Thanks to CML technology the Client, Metropolitana Milanese Spa, saved more than 80% of construction costs and up to 98% of earth-moving compared to a traditional open-trench replacement.

CEMENT MORTAR LINING TECHNOLOGY AT MILANO

 


Related documents:



contact-info2

 

HDD RIVER CROSSING WITH SHARP BENDING RADIUS IN VERY DIFFICULT SOIL CONDITIONS

Client: EDIL IDRAULICA Sas – Italy

Year: 2011

What I did: I made the project management and the supervision of the installation, by HDD, of three HDPE DN 560 (22 in) pressure sewer pipes under the Foglia river, Pesaro, Italy. Three directional pilot bore, with an interaxis of just 1,5 m, along a drill path with a very sharp bending radius (70 m), were successfully drilled under the river bed, facing challenging soil conditions, with big boulders and blocks of stone in a matrix of silt and clay. Although the three pilot bores were perfectly completed, on the first alignment, after completed the first final reaming at 700 mm, the first pull-back failed due to the collapse of underground unstable big blocks of rock. Despite the prohibitive soil conditions we successfully completed the pullback of the two remaining product pipes, achieving a remarkable result in a very difficult HDD work.

HDD RIVER CROSSING WITH SHARP BENDING RADIUS IN VERY DIFFICULT SOIL CONDITIONS

 


contact-info2

LANDFILLS INSULATION BY HDD

Client: MC Scarl – Cooperativa MUCAFER Scpa – Italy

Year: 2010

What I did: I worked for the main contractor MC Scarl – Cooperativa MUCAFER Scpa, as the specialized advisor for the HDD operations in the insulation of two urban landfills, for the environmental securing of the area. In less than one year approximately 60 km (37 miles) – corresponding to more than 500 horizontal directional boreholes – were drilled through soft to hard limestone rock in order to carry out underground injections to create a bottom screen below the garbage level  (total value of the HDD installations: €14M). This was the biggest project of ever for a landfill insulation made by HDD. The specialized subcontractor for HDD and soil treatments was TREVI Spa.

LANDFILLS INSULATION BY HDD

contact-info2

 

 

INSTALLATION OF A GRP DN600 PIPE BY PILOT TUBING

Client: EUROSCAVI Srl – Italy

Year: 2011

What I did: I made the detailed design and work supervising of the installation, by pilot tubing, of a DN600 (24 in) GRP pipe for the connection of two ventilation shafts in the new subway line C in Rome, Italy.

INSTALLATION OF A GRP DN600 PIPE BY PILOT TUBING


contact-info2

 

OIL PIPELINE REHABILITATION BY FLEXIBLE HIGH-PRESSURE HOSES

Client: ENI Spa – Italy

Year: 2014

What I did: I made the feasibility study and wrote the technical standard for the rehabilitation, by flexible high-pressure hoses, of two 12″ oil pipeline, each one 1.800 m long, with multiple curves. Total length 3.600 m (11.800 ft).


Related documents:



contact-info2 

 

PIPE BURSTING AND UV-CIPP AT THE FLORENCE AMERICAN CEMETERY OF THE WWII

Client: SPUNTON IMPIANTI SrlADVANCED SERVICES Srl – Italy

Year: 2012

What I did: detailed design and project management of the replacement, by pipe bursting, of concrete sewer pipes DN200-400 (8-16 in) and of the rehabilitation by UV-CIPP of concrete sewer pipes DN 250, 400, 600, 700, 800, 900 and 1000 mm (10, 16, 24, 28, 32, 36 and 40 in) for a total length of 2,5 km (1,6 miles) at the Florence American Cemetery of the WWII.

PIPE BURSTING AND UV-CIPP AT THE FLORENCE AMERICAN CEMETERY OF THE WWII

Related documents:



contact-info2