Client: BERRO & SARTORI INGEGNERIA Srl – CONSTA Spa
Year: 2012
What I did: I made the detailed design of the installation by microtunneling of a concrete pipe DN1600 (63 in), below the Osellino Channel at Mestre, Venezia – Italy.
Client: BERRO & SARTORI INGEGNERIA Srl – CONSTA Spa
Year: 2012
What I did: I made the detailed design of the installation by microtunneling of a concrete pipe DN1600 (63 in), below the Osellino Channel at Mestre, Venezia – Italy.
Client: B&M Ingegneria Srl – Italy
Year: 2012
What I did: I made the preliminary and detailed design of the installation by microtunneling of a steel casing 72″ (1828 mm) 95 m long, along a 16% inclined drive, for the connection of two water tanks, at Nervesa della Battaglia for the main client ATS Srl, Italy.
Related documents:
Client: FONDAZIONI SPECIALI Spa, Italy
Year: 2011-2012
What I did: I worked as the head of R&D of the HDD division, having the following charges:
I also made the detailed design, performing the role of problem solver during the execution of large river crossing carried out by HDD for the installation of gas pipelines:
Client: CONSORZIO DELLA BONIFICA PARMENSE, Italy
Year: 2015
What I did: I made the feasibility study and the detailed design of the rehabilitation by UV-CIPP of a concrete pressurized water main DN1100 (43 in) for a total length of 1.700 m (5.600 ft).
Related documents:
Client: ITE Srl, CUBA
Year: 2013-2014
What I did: I made the detailed design and project management of the installation of an high tension electrical infrastructure, performed by using dry directional drilling. All the installations were carried out in karstic rock (sandstone and limestone) with voids and caverns. Pilot bores were drilled by using a Down-The-Hole 4″ directional air powered hammer, equipped with a wireline Digitrack guidance system. Each borehole was reamed up to 550 mm (22 in). The overall installation length was 1.000 m (3,300 ft). Max crossing length: 220 m.
Related documents:
Client: Revolution Directional Drilling Technology Srl – Italy
Year: 2005-2007
What I did: I developed the idea of a new laser based guidance system for horizontal directional drilling, operating in 2 1/2″ drill string, with a minimum bending radius of 25 m; the system was called ALICE; I developed the algorithm, collaborating to the construction and testing phase of prototypes.
I carried out the feasibility studies for the application of HDD to pre-tunneling compensation grouting and directional underground injections for insulation and treatment.
Client: Colli Drill Spa, Rome – ITALY
Year: 1994-2007
What I did: I designed the product (drill pipes) in a wide range of diameters, connection types and lengths, setting-up all the mechanical calculation methods; then I studied the manufacturing process (friction welding, thermo-chemical treatments, post welding heat treatments) and all the control procedures; and finally I designed and supervised the construction of the manufacturing plant. Six year of continuous research, enthusiasm, errors and success, achieving a deep knowledge about the directional drilling process, and steel and metallurgy. We set a new standard reference in the industry of drill pipes for shallow horizontal directional drilling. Some patents and some innovative ideas complete the achievements reached thanks to this collaboration.
Related documents: