Client: B&M Ingegneria Srl – Italy
Year: 2012
What I did: I made the preliminary and detailed design of the installation by microtunneling of a steel casing 72″ (1828 mm) 95 m long, along a 16% inclined drive, for the connection of two water tanks, at Nervesa della Battaglia for the main client ATS Srl, Italy.
Related documents:
- Le peculiarità del Microtunnelling – Le Strade – n. 3 – March-05 – Italy
- Le nuove frontiere della tecnologia – Quarry & Construction – Feb. 2012, Italy