INSTALLATION OF A GRP DN600 PIPE BY PILOT TUBING

Client: EUROSCAVI Srl – Italy

Year: 2011

What I did: I made the detailed design and work supervising of the installation, by pilot tubing, of a DN600 (24 in) GRP pipe for the connection of two ventilation shafts in the new subway line C in Rome, Italy.

INSTALLATION OF A GRP DN600 PIPE BY PILOT TUBING


contact-info2

 

OIL PIPELINE REHABILITATION BY FLEXIBLE HIGH-PRESSURE HOSES

Client: ENI Spa – Italy

Year: 2014

What I did: I made the feasibility study and wrote the technical standard for the rehabilitation, by flexible high-pressure hoses, of two 12″ oil pipeline, each one 1.800 m long, with multiple curves. Total length 3.600 m (11.800 ft).


Related documents:



contact-info2 

 

PIPE BURSTING AND UV-CIPP AT THE FLORENCE AMERICAN CEMETERY OF THE WWII

Client: SPUNTON IMPIANTI SrlADVANCED SERVICES Srl – Italy

Year: 2012

What I did: detailed design and project management of the replacement, by pipe bursting, of concrete sewer pipes DN200-400 (8-16 in) and of the rehabilitation by UV-CIPP of concrete sewer pipes DN 250, 400, 600, 700, 800, 900 and 1000 mm (10, 16, 24, 28, 32, 36 and 40 in) for a total length of 2,5 km (1,6 miles) at the Florence American Cemetery of the WWII.

PIPE BURSTING AND UV-CIPP AT THE FLORENCE AMERICAN CEMETERY OF THE WWII

Related documents:



contact-info2 

 

R&D IN HDD AND DETAILED DESIGN OF LARGE RIVER CROSSINGS

Client: FONDAZIONI SPECIALI Spa, Italy

Year: 2011-2012

What I did: I worked as the head of R&D of the HDD division, having the following charges:

  • feasibility studies for the application of HDD and microtunneling technologies
  • R&D for the use of HDD in compensation and jet grouting.
  • R&D for a non-conventional guidance system for HDD
  • R&D for hole supporting in up-hill directional drilling
  • organization and management of the mud laboratory.
  • training of engineers, supervisors and operators.

I also made the detailed design, performing the role of problem solver during the execution of large river crossing carried out by HDD for the installation of gas pipelines:

  • PO river, Italy, DN600 (24 in) for a total length of 1.300 m (4,300 ft)
  • Enza river, Italy, DN100 (4 in) for a total length of 1.200 m (4,000 ft) 
R&D IN HDD AND DETAILED DESIGN OF LARGE RIVER CROSSINGS

contact-info2

UV-CIPP OF A LARGE WATER PRESSURE PIPE

Client: CONSORZIO DELLA BONIFICA PARMENSE, Italy

Year: 2015

What I did: I made the feasibility study and the detailed design of the rehabilitation by UV-CIPP of a concrete pressurized water main DN1100 (43 in) for a total length of 1.700 m (5.600 ft).

UV-CIPP OF A LARGE WATER PRESSURE PIPE

Related documents:


contact-info2

DIRECTIONAL DRILLING IN CUBA

Client: ITE Srl, CUBA

Year: 2013-2014

What I did: I made the detailed design and project management of the installation of an high tension electrical infrastructure, performed by using dry directional drilling. All the installations were carried out in karstic rock (sandstone and limestone) with voids and caverns. Pilot bores were drilled by using a Down-The-Hole 4″ directional air powered hammer, equipped with a wireline Digitrack guidance system. Each borehole was reamed up to 550 mm (22 in). The overall installation length was 1.000 m (3,300 ft). Max crossing length: 220 m.

DIRECTIONAL DRILLING IN CUBA

Related documents:


contact-info2

DEVELOPMENT OF DRY DIRECTIONAL DRILLING TECHNOLOGY

Client: SE Srl, Italy

Year: 1997-2002

What I did:  I collaborated in the development and application of the Dry Directional Drilling technology, being member of the team that developed this technology.

About Dry Directional Drilling technology: DDD is based on the use of compressed air at low pressure (175/360 psi – 12/25 bar) instead of traditional bentonite mud. Down the hole percussive air powered tools have a blow frequency that ranges from 900 to 1.500 blow per minute, which means that they are able to drill, with successful results, any kind of soil and any kind of hard rock banks, even when the rock has a resistance to compression of more than 29,000 psi (200 MPa). The rotating and percussive action exerted by the down-the-hole tool is extremely efficient even in presence of very hard rocks. Moreover, it turns out to be very useful in presence of soft soils, since the percussive action generates a pre-consolidation of the soil, so that it facilitates the drilling and steering stage.

DEVELOPMENT OF DRY DIRECTIONAL DRILLING TECHNOLOGY

Related documents:


 

contact-info2

 

OPTICAL GUIDANCE SYSTEM FOR HDD & COMPENSATION GROUTING BY HDD

Client: Revolution Directional Drilling Technology Srl – Italy

Year: 2005-2007

What I did: I developed the idea of a new laser based guidance system for horizontal directional drilling, operating in 2 1/2″ drill string, with a minimum bending radius of 25 m; the system was called ALICE; I developed the algorithm, collaborating to the construction and testing phase of prototypes.

I carried out the feasibility studies for the application of HDD to pre-tunneling compensation grouting and directional underground injections for insulation and treatment.

OPTICAL GUIDANCE SYSTEM FOR HDD & COMPENSATION GROUTING BY HDD

contact-info2

LAUNCH OF DRY DIRECTIONAL DRILLING TECHNOLOGY IN THE NORTH AMERICAN MARKET

Client: SE INDUSTRIES Inc., Montreal, QC – Canada

Year: 2000-2002

What I did:  I was the General Manager and VP Marketing, Sales and Development of the company. I actively collaborated in the development and application of the Dry Directional Drilling technology, being member of the team that developed this technology. I was the key person for the launch of this technology in the North American market, conceiving and implementing the marketing strategies and managing the relationships with public and private investors interested in this technology.

About Dry Directional Drilling technology: DDD is based on the use of compressed air at low pressure (175/360 psi – 12/25 bar) instead of traditional bentonite mud. Down the hole percussive air powered tools have a blow frequency that ranges from 900 to 1.500 blow per minute, which means that they are able to drill, with successful results, any kind of soil and any kind of rock banks, even when the rock has a resistance to compression of more than 29,000 psi (200 MPa). The rotating and percussive action exerted by the down-the-hole tool is extremely efficient even in presence of very hard rocks. Moreover, it turns out to be very useful in presence of soft soils, since the percussive action generates a pre-consolidation of the soil, so that it facilitates the drilling and steering stage.

SPREADING OF THE DRY DIRECTIONAL DRILLING TECHNOLOGY IN THE NORTH AMERICAN MARKET

Related documents:


contact-info2

 

28 KM OF URBAN CABLING PROJECT BY HDD

Client: Hydro Quebec, Montreal, QC – Canada

Year: 2000-2001

What I did:  I collaborated on the design of a specialized pit launched drilling rig (the pit-launched 250 Scorpio dry directional drilling rig – with 7 tons of pullback force) and on the detailed design of the installation project of more than 28 km (17 miles) of medium tension electrical cables (3 kV), for the connection of 1.000 houses, in the city of Hampstead, Montreal – QC, Canada. I also carried out the training of the engineers and operators both of the Client (Hydro Quebec) and of the Contractor, and I supervised the work in order to assure the expected productivity.

28 KM OF URBAN CABLING PROJECT BY HDD

Related documents:


contact-info2